A good view of the casemate 4 for a 10.5cm gun.

15/03/1944 the concrete work was ready and many of the corridors made.

31/03/1944 the guns were placed and connected, but no personnel were allocated to it.

15/04/1944 battery operational with Navy personnel right up until 31/06/1944 and the corridors finished off.

 

 

   
 
Casemate 4 StP255 Fort du Roule M.K.B, Cherbourg
   
 