Wn17 de Colleville ("Hohe 61" ) [Hillman], PART1 K.V.U.Gr Riva-Bella, K.V.Gr Caen, KVR H1, Normandy.
WN · K.V.Gruppe River-Bella (Sword & Juno Beaches) · AOK 7 Normandy · France
Wn17 de Colleville PART1
Stab Gren. Rgt. 736.
Stab I./A.R.1716.
1 x R605 Gun bunker ii.
2 x R608 Battalion & Regimental Headquarters.
3 x Vf/Bf58c Tobruk's.
1 x Water cistern.
1 x Peilstand [observation].
1 x Cuisine.
1 Brunnenbunker (well water pump).
1 x Vf67 Circular position for tank turret.
9 x Unterstands.
1 x 7.5cm F.K.231(f)
2 x 4.7 cm Pak 181 (f).



Wn17 de Colleville PART1
Plan ---- Here I am covering the white circle.



Wn17 de Colleville PART1
R605 Gun bunker.
A double garage bunker for anti-tank guns.
There were two 4.7 cm Pak 181 (f). One in a fixed position looking north and the other in a mobile role.
The bunker may have been for them or it was intended to have two larger 8.8cm Pak installed.



Wn17 de Colleville PART1
R605 Gun bunker.
The track down into the garage. A safe store for two anti-tank guns with crews quarters in the middle.
This bunker was not finished as D-Day came along before it could be done.
Probably somewhere between Caen and Paris were the two sets of doors waiting to be delivered here.



Wn17 de Colleville PART1
R605 Gun bunker.


Wn17 de Colleville PART1
R605 Gun bunker.
Wn17 de Colleville PART1
R605 Gun bunker.
F.Pz.G.6025 Rechtsausf 434P01 armoured door. This view of the door is the inside with all the fittings on it.
Note the tank wheels leaning against the wall.




Wn17 de Colleville PART1
R605 Gun bunker.
Battle damage, I have seen this sort of damage before, usually from a Sherman's 75mm armoured piercing.


Wn17 de Colleville PART1
R605 Gun bunker Tobruk defence.
The bunker was made in Bauform using a shaped concrete block as shuttering and then between the outer and inner wall, concrete would have been poured in. A quicker and cheaper method of construction.



Wn17 de Colleville PART1
R605 Gun bunker.
Inside the Tobruk.


Wn17 de Colleville PART1
Plan.
Wn17 de Colleville PART1
Trench bridge.
To allow heavy transport to cross a trench a trench bridges were constructed.

Wn17 de Colleville PART1
Cook house I would say kitchen.
Plan.



Wn17 de Colleville PART1
Cousines.

Wn17 de Colleville PART1
Cousines.
Trench and trench covered entrance.

Wn17 de Colleville PART1
Cousines.
Kitchen.



Wn17 de Colleville PART1
Cousines.
Inside.


Wn17 de Colleville PART1
Poste de Garde Nord.
Plan.

Wn17 de Colleville PART1
Poste de Garde Nord.
The steps down to the guard house.

Wn17 de Colleville PART1
Poste de Garde Nord
Trench entrance.

Wn17 de Colleville PART1
Poste de Garde Nord.
The main room.

Wn17 de Colleville PART1
Poste de Garde Nord.
The second room possibly a detention room for defaulters.
Wn17 de Colleville PART1
Poste de Garde Nord.
Window with a shaft down just to allow light in.

Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
You can just see the Cupola to the right of the trees.
"Hohe 61", Cote 61 or hill 61. 61meters above sea level.



Wn17 de Colleville PART1
R608 Battalion & Regimental Headquarters for the Gren.Rgt.736.
The view N/W toward the beach.

Wn17 de Colleville PART1
Deployment of the 736. Grenadier Regiment at the time of D-Day.
This is where the all the separate companies would have been. This Regiment was decimated on D-Day, those that were captured and got back to England as POW's survived. Most were killed in the fighting and any that managed to retreat probably were killed in the latter fighting for Normandy.




Wn17 de Colleville PART1
Deployment of the 736. Grenadier Regiment at the time of D-Day.
Two companies up front in the Wn's and StP's on the coast, one covering Wn14 and the fourth in reserve.



Wn17 de Colleville PART1
R608 Battalion & Regimental Headquarters for the Gren.Rgt.736.
Infantry observation cupola type 749p3 for the PC (Command Post) of the Gren.Rgt.736.



Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
Looking into the bunker entrance.


Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
Tobruk entrance and right of the main entrance.
Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
Inside the Tobruk with range markers painted on the inside. A tube for the Sprachrohr to contact inside of the bunker.
These Tobruk's held off the British advance for quite a long time.


Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
Note the yellow camouflage still on the wall.
Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
Armoured aerial tube cover. The cover twists to the left and lifts off. Then the aerial could be wound up to its full height.


Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
The rear entrance covered by the close combat defence embrasure covering passage.

Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
Attached to the back of the bunker is a water reservoir. A standard bunker water tank.
Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
Most of these were probably taken out and used by every farmer in the area but here and one other I know of in Noirmoutier are still in place.
Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
A small pump engine would have brought water from the well behind and pump it into the tank.

Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
The second entrance looking down the steps at the close combat embrasure covering the entrance. The gate is a 491P2 Gittertür (Screen Door).



Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
Recess may be an anti gas shower??

Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.


Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
The second entrance and 434P01. 6025 type. When the bunker was excavated due to it being used as a dumping ground after the war, it was found that there were no fittings what so ever. The French Navy found out what they were doing and offered them all sorts of items from their becoming redundant old U-Boat pens of Brest & Lorient.


Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
The stairs out of the first entrance with the Gittertür at the top of the stairs. The yellow camouflage paint still on the wall.
Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
R608/SK - the SK is “SK” (Sonder Konstruction) a standard design and named bunker but one that has been adapted, this one has a water tank, water pump and a passage with a cupola. All extra and above what normally would have been their. These large bunkers had only just been built and were brand new. They must have taken many months to build and they lasted half a day in battle.


Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
I believe this to be the escape route out.


Wn17 de Colleville PART1
R608 Battalion Regimental Headquarters for the Gren.Rgt.736.
Infantry observation cupola type 749p3 for the PC (Command Post) of the Gren.Rgt.736.
Not a defence cupola but only used to view out of. Three viewing slits around the sides were fitted with a special type of fortress binoculars. The cupola was brought either from French military stock or taken out of a Maginot fort in eastern France.



Wn17 de Colleville PART1
Zisterne.
An open emergency water supply.

Wn17 de Colleville PART1
R608/SK of the 1./A.R.1716.
We are now at the second R608/SK this one was for the 1./A.R.1716 HQ to manage all the artillery batteries of the 1716 Regiment.


Wn17 de Colleville PART1
I./Artillery Regiment 1716.
To the best of my ability I have plotted where I think all the gun sites that came under Artillery Regiment 1716.


Wn17 de Colleville PART1
I./Artillery Regiment 1716.
The positions of the four artillery batteries of the I./Artillery Regiment 1716.
Stab/ I./ Artillerie-Regiment 1716 Colomby-sur-Thaon (Wn17 de Colleville PART1)
1./ I./ Artillerie-Regiment 1716 ‘Merville Battery’
2./ I./ Artillerie-Regiment 1716 Strong point WN16 (‘Daimler’ at Colleville)
3./ I./ Artillerie-Regiment 1716 Briéville
4./ I./ Artillerie-Regiment 1716 Strong point WN12 (‘Château D’eau Battery’ at Ouistreham)
Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
Plan.


Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
Entrance into the Tobruk.
Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
Inside the Tobruk.
Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
The view out of the Tobruk where the Machine gunners held of the Allied advance.

Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
The Tobruk.

Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
Rear entrance.


Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
The first entrance into the bunker.

Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
Gas lock.


Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
Radio aerial fitting. The aerial would slot in here and a handle to wined up the aerial to its full height.



Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
Close combat defence embrasure possibly a 57P8.


Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
The second rear entrance and it looks here that there was quite a battle that went on. Many hits from small arms.



Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
The second entrance with plenty of bullet marks.

Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
The water pump house and tank rooms.
Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
Pump house.
Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
Water tank room now removed.
Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
A Selfie. Mike and I photographing the aerial armoured cover in the early morning sun.
Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
These Cupolas were removed after the war and scrapped and were replaced to look like the originals.
From here the artillery battle would have been fought at the start of D-Day when the first ships were seen off the coast.

Wn17 de Colleville PART1
R608/SK CP for I./Artillery Regiment 1716.
Wn17 de Colleville PART1
Unterstand.
Steps down into the Unterstand. A very basic style bunker.


Wn17 de Colleville PART1
Unterstand.
Looking into the entrance.
Wn17 de Colleville PART1
Unterstand.
The escape

Wn17 de Colleville PART1
Unterstand.
Second crew room with a window to the left. These bunkers may have been started to be built in 1941 to 1943 and the larger bunkers came on in 1943/1944.


Wn17 de Colleville PART1
Unterstand.
Second crew room with a window to the now on the right..


Wn17 de Colleville PART1
Unterstand.
The first crew room.

Wn17 de Colleville PART1
Unterstand.
Entrance/way out with a large drain in place and the steps up.

Wn17 de Colleville PART1
Well bunker.
This is the well bunker to draw water for the Wn defence.

Wn17 de Colleville PART1
Well bunker.
The entrance down.

Wn17 de Colleville PART1
Well bunker.
Plan.
Wn17 de Colleville PART1
Well bunker.
The entrance.
Wn17 de Colleville PART1
Well bunker.
The well.

Wn17 de Colleville PART1
Well bunker.
And the way out.
Wn17 de Colleville PART1